UVC Light  Max 25 Banner Image
UVC Light  Max 25 UV Light

The UVC MAX 25 unit is designed to emit powerful ultraviolet light rays, which sterilize and reduce airborne microorganisms as they pass through a home heating and air conditioning system. They are installed in the main air supply or return duct of the home system, and operate continuously to automatically purify air in the home for 24 hours a day.

WARNING: TO PREVENT SERIOUS INJURY, DO NOT PLUG-IN AND TURN ON LIGHT UNTIL AFTER IT HAS BEEN COMPLETELY INSTALLED.

Placement Location:
A-Frame Coil

A-Frame Coil Placement for UVC Light  Max 25

Placement Location:
Vertical Coil

Vertical Coil Placement for UVC Light  Max 25

Installation Instructions - Duct Board

UVC Light  MAX 25 Step 1 Image Duct Board

Step 1 - Duct Board

When the proper location for the UVC MAX 25 has been selected, use the duct board mounting plate (5”x7” overall) to draw lines where the duct board must be cut 3” wide by 4 1/4” tall.


UVC Light  MAX 25 Step 2 Image Duct Board


UVC Light  MAX 25 Step 2.5 Image Duct Board

Step 2 - Duct Board

Cut the rectangular hole and remove the loose piece of duct board or aluminum duct.     


UVC Light  MAX 25 Step 3 Image Duct Board

Step 3 - Duct Board

Place the mounting plate over the access hole.   


UVC Light  MAX 25 Step 4 Image Duct Board

Step 4 - Duct Board

Bend the mounting plate 90 degrees at the first score point.

Do the same for the bottom score point. 


UVC Light  MAX 25 Step 5 Image Duct Board

Step 5 - Duct Board

Bend the mounting plate 90 degrees at the second score point.

Do the same for the bottom second score point.      


UVC Light  MAX 25 Step 6 Image Duct Board

Step 6 - Duct Board

Insert to UVC MAX 25 into the mounting plate access. 


UVC Light  MAX 25 Step 7 Image Duct Board


UVC Light  MAX 25 Step 7.5 Image Duct Board

Step 7 - Duct Board

Insert the 4 screws provided into the mounting plate corner holes.


UVC Light  MAX 25 Step 8 Image Duct Board

Step 8 - Duct Board

Plug the UVC MAX 25 into a nearby socket.

(24 volt transformer option included for contractor installation)


UVC Light  MAX 25 App Download Instruction

Step 9 - Duct Board

Download the UVC MAX 25 APP from the
Mac App store on your device,
or the Google Play Store.

Installation Instructions - Metal Duct

UVC Light  MAX 25 Step 1 Image Aluminium Installation

UVC Light  MAX 25 Step 1.5 Image Aluminium Installation

Step 1 - Metal Duct

When the proper location for the UVC MAX 25 has been selected, cut open a 3" hole in the center of the duct.



UVC  Light MAX 25 Step 2 Image Aluminium Installation

Step 2 - Metal Duct

Insert the UVC MAX 25.     


UVC  Light MAX 25 Step 3 Image Aluminium Installation

UVC  Light MAX 25 Step 3 Image Aluminium Installation

Step 3 - Metal Duct

Place screws and drive screws into aluminum.


UVC Light  MAX 25 Step 4 Image Aluminium Installation

Step 4 - Metal Duct

Plug in the UVC MAX 25  

(24 volt transformer option included for contractor installation) 


UVC Light MAX 25 App Download Instruction

Step 5 - Metal Duct

Download the UVC MAX 25 APP from the
Mac App store on your device,
or the Google Play Store.


Contact Us

Air-Care
3868 E. Post Road
Las Vegas, NV, 89120
(800) 322-9919

Our Other Products

 Copyright © 2020 Air-Care. All rights reserved.